49 PT Wijaya Karya (Persero) Tbk Tinjauan Pendukung Bisnis Business Support Overview Tata Kelola Perusahaan Good Corporate Governance Laporan Keuangan Financial Report Tanggung Jawab Sosial dan Lingkungan Corporate Social Responsibility • Completed the Longest Bridge in Sumatra (Dompak Bridge), Kalimantan (Tayan Bridge), and Maluku (Merah Putih Bridge) in 2016. • The President of Republic of Indonesia conducted the first high speed train project groundbreaking in Southeast Asia, where WIKA has a strategic role in building and implementing the Jakarta-Bandung trace high speed train service (2016). • PT WIKA Beton Tbk and PT WIKA Gedung Tbk formed a joint venture PT WIKA Pracetak Gedung to capture the potential of precast concrete vertical residential buildings (2016). • WIKA established PT WIKA Serang Panimbang (2017) as a toll road business while simultaneously building the toll road. • Completed the Semanggi Interchange (2017) as the longest curved ring road in Indonesia and the second icon of Jakarta, after the Monument National (Monas). • Completed the 3rd Terminal of Soekarno Hatta International Airport as the largest terminal in the country (2017). • Completed the second largest Dam that built after Indonesia independent day, Jatigede Dam, Sumedang (2017). • Successfully issued Komodo Bonds on the London Stock Exchange, where WIKA’s Komodo Bonds were oversubscribed 2.5 times. • Built the world’s best sports venues for the 2018 Asian Games; Jakarta International Velodrome, Jakarta International Equestrian Park, GBK Venues: Madya Stadium, Softball, Baseball, Basketball, Squash and Wisma Atlet Kemayoran. • Completed Moda Raya Terpadu (MRT) as the first and most modern railway transportation mode in Jakarta that connects Lebak Bulus - Hotel Indonesia Roundabout with a distance of 16 km. • Completed the first toll road in Kalimantan (Balikpapan-Samarinda), Sulawesi (Manado-Bitung), the 14.3 km New Yogyakarta International Airport underpass, the longest underpass in Indonesia. • Introduced WIKA 2030 Vision and Mission with the goal of becoming a Leader in Sustainable Investments and EPC for a Better Quality of Life. • WIKA issued a Sustainable Public Offering of Wijaya Karya Sustainable Bonds I Phase I 2020 with a principal amount of Rp1,500,000,000,000 and Wijaya Karya Sustainable Mudharabah Sharia Bonds I Phase I 2020 with a total funds of Rp500,000,000,000. • WIKA issued a Sustainable Public Offering of Wijaya Karya Sustainable Bonds II with a principal amount of Rp3,500,000,000,000 and Wijaya Karya Sustainable Mudharabah Sharia Bonds II with a total funds of Rp1,500,000,000,000. • In 2021, WIKA expanded its business expand by entering the airport investment sector through the establishment of an Implementing Business Entity (BUP), PT Batam International Airport. • In 2022, WIKA issued a Sustainable Public Offering of Wijaya Karya Sustainable Bonds III with a principal amount of Rp4,000,000,000,000 and Wijaya Karya Sustainable Mudharabah Sharia Bonds III with a total funds of Rp1,000,000,000,000 • WIKA divested Kunciran Cengkareng Toll Road and one of the associated entities in the port sector, namely PT Terminal Petikemas • WIKA has succeeded in completing 3 PSNs, namely Randugunting Dam in Blora, Sukamahi Dam in West Java and Kijing Terminal, as well as the G20 supporting project, namely Revitalization of VVIP Halim Airport, VVIP Terminal of I Gusti Ngurah Rai Airport in Bali and preservation of roads and bridges in Badung Bali national road corridor. • WIKA successfully completed the PSN project, Jakarta Bandung High Speed Train (KCJB), which became the first high speed train in Indonesia and Southeast Asia. • To support the 2023 ASEAN High Level Conference (KTT), WIKA completed the Jakarta Convention Center (JCC) revitalization project for 72 days • WIKA has completed the construction project of Ciliwung waterway to East Flood Canal (KBT), which is part of the Government’s efforts to overcome flooding from upstream to downstream. • WIKA’s efforts to demonstrate its commitment to decarbonization by planting 6,300 mangrove tree seedlings in • The Company has thoroughly updated the ERP system in projects carried out by WIKA using JO (joint operation) and non-JO mechanisms to improve cost control in order to boost profitability
RkJQdWJsaXNoZXIy NTM2MDQ5